chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Generator Overhaul|Page 6463 > < Generator Overhaul|Page 6461
Page 7
background image

10. Measure the condenser (2) capacity using a digital capacitor meter. If the condenser capacity is not 0.5 microfarads, replace the rectifier (1).

Assembly Procedure

1. Connect the brushes (2) to the regulator (1).
2. Install the brush springs and the brushes to the regulator so that the label on each brush is 2-3 mm (0.008-0.012 in) from the rectifier.

3. Solder the brush lead wires (2) to the regulator terminals.
4. Install the brush lead wire cover.
5. Connect the brush holder to the regulator.
6. Install the regulator and the brush holder to the rear housing.

Generator Overhaul|Page 6463 > < Generator Overhaul|Page 6461