chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Main Relay (Computer/Fuel System) > < Diagram Information and Instructions|Page 7577
Page 2
background image

Notice:  Refer to Fastener Notice.

1.  Install the PCM mounting studs (5) to the intake manifold, if removed.

Tighten the studs to 6 N.m (53 lb in).

2.  Install the PCM (1) onto the studs (5).
3.  Install the PCM retaining bolts (3).

Tighten the bolts to 8 N.m (71 lb in).

4.  Install the PCM retaining nuts (6).

Tighten the nuts to 8 N.m (71 lb in).

5.  Install the PCM harness connectors (2) to the PCM body.
6.  Tighten the PCM harness connector retaining bolts (4).

Tighten the bolts to 8 N.m (71 lb in).

7.  If a new PCM is being installed, the PCM must be programmed. Refer to Control Module References.  See: Testing and Inspection/Programming

and Relearning

Main Relay (Computer/Fuel System) > < Diagram Information and Instructions|Page 7577