TrailBlazer 4WD L6-4.2L VIN S (2002)
1. Install the check link assembly through the door access hole. Ensure that the position arrow is pointing forward.
Notice: Refer to Fastener Notice in Service Precautions.
2. Install the 2 check link retaining nuts to the door.
Tighten nuts to 7 N.m (62 lb in).
3. Install the rubber dust boot to the check link.
4. Install the 2 bolts that retain the check link to the pillar.
Tighten the bolts to 15 N.m (11 lb ft).
5. Install and fully seat the water deflector.
6. Install the door trim panel.