TrailBlazer 4WD L6-4.2L VIN S (2002)
1. Install EBCM (2) onto BPMV (3).
Notice: Refer to Fastener Notice in Service Precautions.
Important: Do not reuse the old mounting bolts. Always install new bolts with the new BPMV.
2. Install the four EBCM bolts.
^
Tighten the four bolts to 5 Nm (39 inch lbs.) in an X-pattern.
3. Connect the 2 way ABS pump motor connector to the EBCM (2).
4. Install BPMV (3) to EHCU bracket (5).
5. Connect the two electrical harness connectors to the EBCM (2).
Important: The brake pipes are held in the proper place by a frame mounted plastic bracket. Make sure that the brake pipes stay in the correct place
for proper reassembly.
6. Install the 5 brake pipes to the BPMV (3).
^
Tighten the brake pipe fittings to 30 Nm (22 ft. lbs.).
7. Bleed the brake system.