TrailBlazer 4WD L6-4.2L VIN S (2002)
12. Twist together 2 connector wire leads-the high circuits from both stages of the steering wheel module-to one of the deployment harness wires.
Refer to SIR Connector End Views in order to determine the correct circuits.
13. Inspect that the 3 wire connection is secure.
14. Bend flat the twisted connection.
15. Secure and insulate the 3 wire connection to the deployment harness using electrical tape.