TrailBlazer 4WD L6-4.2L VIN S (2002)
23. Cut the side impact module left connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.
24. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.
25. Cut two 4.6 m (15 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used for the side impact
module-left deployment harness.
26. Strip 13 mm (0.5 in) of insulation from both ends of these wires.
27. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power
source until you are ready to deploy the inflator module.