chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

A/T - Cooler Line Fitting Applications|Page 6947 > < A/T - Cooler Line Fitting Applications|Page 6945
Page 1
background image

Fluid Line/Hose: Service and Repair

Transmission Fluid Cooler Hose/Pipe Replacement (Body Vin Code 3) 

Removal Procedure

Important:  The front and rear sections of the cooler lines can be serviced separately. Refer to the appropriate steps when servicing individual lines.
Perform the following procedure when removing the cooler lines from the quick connect fittings.

1. Pull the plastic cap back from the quick connect fitting and down along the cooler line about 5 cm (2 inch).
2. Using a bent-tip screwdriver, pull on one of the open ends of the retaining ring in order to rotate the retaining ring around the quick connect fitting

until the retaining ring is out of position and can be completely removed.

3. Remove the retaining ring from the quick connect fitting.
4. Discard the retaining ring.

5. Pull the cooler line straight out from the quick connect fitting.

6. Raise the vehicle. Refer to Vehicle Lifting.
7. Place a drain pan under the vehicle.

A/T - Cooler Line Fitting Applications|Page 6947 > < A/T - Cooler Line Fitting Applications|Page 6945