chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Floor Shift Control Replacement|Page 7085 > < Floor Shift Control Replacement
Page 2
background image

1. Install the transmission control. 

Notice:  Refer to Fastener Notice in Service Precautions.

2. Install the transmission control bolts. 

^

Tighten the transmission control bolts to 25 Nm (18 ft. lbs.).

3. Install the range selector cable (2) to the floor shift control.
4. Install the end of the range selector cable (1) to the transmission control ball stud.
5. Connect the shift lock control solenoid wiring harness.

6. Install the front floor console. 
7. Check for proper operation of the floor shift control.
8. Adjust the range selector cable if necessary. 

Floor Shift Control Replacement|Page 7085 > < Floor Shift Control Replacement