TrailBlazer 4WD V8-6.0L (2007)
5. Connect the evaporator tube (4) to the evaporator (1).
6. Install the nut (3).
Tighten the nut to 28 N.m (21 lb ft).
7. Install the coolant reservoir.
8. Install the accumulator.
9. Recharge the refrigerant system. Refer to Refrigerant Recovery and Recharging.
10. Leak test the fittings of the components using the J39400-A.