chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Front Subframe|Service and Repair|Page 904 > < Front Subframe|Service and Repair|Page 902
Page 9
background image

16. Remove the alignment pins from the frame.
17. Install the underbody rear side rail. Refer to Underbody Rear Side Rail Replacement   ().

Note:  The engine and transmission mount nuts must be replaced once removed. When the nut has to be loosened or removed, threadlocker must
be used in addition to using a new nut. Allow adhesive on new engine and transmission mount nuts to cure for 24 hours after replacement. 

18. Apply threadlocker GM P/N 12345382 (Canadian P/N 10953489) to the engine and transmission mount threads.
19. Install the engine and transmission mount nuts and tighten to 75 Nm (55 lb ft).

20. Install the power steering cooler inlet pipe to the frame. Refer to Power Steering Cooler Pipe/Hose Replacement   .
21. Install the power steering gear to the frame. Refer to Steering Gear Replacement   .
22. Install the power steering gear bolts. Refer to Steering Gear Replacement   .
23. Install the power steering gear heat shield. Refer to Steering Gear Heat Shield Replacement   .

Front Subframe|Service and Repair|Page 904 > < Front Subframe|Service and Repair|Page 902