chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12956 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12954
Page 9
background image

25. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment

harness.

26. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
27. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the side impact module.

28. Twist together one connector wire lead to one deployment wire.
29. Inspect that the previous connection is secure.

30. Bend flat the twisted connection.
31. Secure and insulate the connection using electrical tape.

32. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
33. Connect the deployment harness to the side impact module LF.

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12956 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12954