chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Technician Safety Information|Page 10350 > < Technician Safety Information|Page 10348
Page 3
background image

10. Remove the battery ground negative and battery positive cables from the vehicle.
11. Separate the battery ground negative and battery positive cables.

INSTALLATION PROCEDURE

1. Install the battery ground (negative) and the battery positive cables to the vehicle.
2. Install the battery cable conduit retainers to the inner fender (1) and the lower tie bar (2).

3. Install the battery positive cable and nut to the starter motor BAT terminal.

Tighten the starter motor BAT terminal nut to 10 N.m (89 lb in).

NOTE:  Refer to Fastener Notice in Service Precautions.

4. Install the battery ground (negative) cable and nut to the transaxle stud.

Tighten the battery ground (negative) cable nut to 25 N.m (18 lb ft).

Technician Safety Information|Page 10350 > < Technician Safety Information|Page 10348