chevrolet Workshop Repair Guides

Chevrolet Workshop Service and Repair Manuals

Positive Crankcase Ventilation > < EGR Valve|Diagrams|Page 6482
Page 2
background image

1. Install a new EGR valve gasket.
2. Install the EGR valve.
3. Install the EGR valve bolts.

NOTE:  Refer to Fastener Notice.

Tighten the bolt to 30 N.m (22 lb ft).

4. Install the EGR pipe to the EGR valve.
5. Install the EGR pipe.

Tighten the bolt to 25 N.m (18 lb ft).

6. Connect the electrical connector (1) to the EGR valve (2).
7. Raise the vehicle.
8. Position the transaxle fill tube to the normal installed position and install the fill tube nut at the EGR valve.

Tighten the nut to 113 N.m (115 lb in).

9. Install the transaxle fill tube bolt to the transaxle case.

Tighten the bolt to 113 N.m (115 lb in).

10. Lower the vehicle.
11. Install the air cleaner inlet duct.

Positive Crankcase Ventilation > < EGR Valve|Diagrams|Page 6482