Aspen 2WD V8-4.7L (2007)
4. Install new mounting nuts (2) and tighten to 27 Nm (20 ft. lbs.)
5. Install the brake lines (5) and tighten to 19 Nm (170 in. lbs.).
6. Reconnect the electrical connector (4) for the low fluid level switch.
7. Fill and bleed the base brake system.