Aspen 2WD V8-4.7L Flex Fuel (2009)
INSTALLATION
1. Position the trim panel (2) over the retaining tabs (1) and slide into place fully.
2. Install the screws (3).
3. Install the D-pillar trim. See: Pillar Trim/D-Pillar Trim/Installation
Upper
INSTALLATION
1. Connect the power outlet electrical connector, if equipped.
2. Position the trim panel onto the quarter panel and seat the retaining clips fully.
3. Install the three forward screws (4).
4. Install the rear screw (1).
5. Install the tie down (3) and tie down anchor bolt (2).
6. Tighten the bolt to 12 Nm (9 ft. lbs.)
7. Install the C-pillar trim. See: Pillar Trim/C-Pillar Trim Panel-Installation