chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Handling Tubing and Fittings|Page 8407 > < Handling Tubing and Fittings|Page 8405
Page 2
background image

INSTALLATION

For installation, reverse the above procedures. 
-

Tighten bolts to 22 Nm (200 in lb).

NOTE:  When charging system -- after replacing lines -- add 44 ml (1.50 oz) SP10 PAG (polyalkalene glycol) refrigerant oil or equivalent.

Handling Tubing and Fittings|Page 8407 > < Handling Tubing and Fittings|Page 8405