Concorde V6-215 3.5L SOHC (1996)
Auburn Hills, Michigan 48326-2757
Additional Information
If you have any questions or need assistance in completing this action, please contact your Zone Service Office.
A. Leak Test and Remove the Fuel Rail
1.
Remove the air inlet hose between the air cleaner and inlet plenum.
2.
Disconnect the PCV makeup air hose and idle air control (IAC) supply hose (part of the air inlet plenum) then disconnect the air inlet plenum from
the throttle bodies and set it aside. Do not remove the inlet plenum from behind the manifold.
3.
Remove the engine cover from the top of the intake manifold plenum.
4.
Hold the throttle lever in the wide-open position and remove the throttle cable and speed control cable from the lever (Figure 1).
5.
Remove the throttle cable and speed control cable from their mounting bracket by compressing the locking tabs (Figure 1).
6.
Disconnect the IAC and intake air temperature sensor electrical connectors (Figure 2).
7.
Disconnect the vacuum hose from the manifold tuning valve (MTV) (Figure 2).