chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Oil Line, Engine|Description and Operation|Page 1366 > < Oil Line, Engine|Description and Operation|Page 1364
Page 3
background image

1. Install the oil cooler (1) onto the vehicle.
2. Install the four bolts attaching the oil cooler (1) to the engine. Tighten bolts to 11 Nm (97 inch lbs.).
3. Install the cooler lines (2).

4. Install the upper radiator hose from the thermostat housing.
5. Install the air pump switchover valve (1) and gasket. 
6. Install the vacuum line (3).

7. Install the left hand intake plenum by installing the retainer bolts (1).

Oil Line, Engine|Description and Operation|Page 1366 > < Oil Line, Engine|Description and Operation|Page 1364