PT Cruiser L4-2.4L (2008)
Hood Hinge: Service and Repair
Installation
INSTALLATION
1. If installing a new hinge (2), paint the hinge prior to installation.
2. Position the hinge onto the hood (1) and fender (3) and align the hinge to the previously marked locations.
3. Install the nuts that secure the hinge to the hood and fender. Tighten the nuts to 33 Nm (24 ft. lbs.).
4. Install the cowl grille screen See: Cowl/Cowl Moulding / Trim/Service and Repair/Installation.
5. Remove the support and verify hood alignment and operation. The hood should fit flush across the top surfaces along fenders and have even gaps
aligned to 4 mm (0.160 in.) to the adjacent body panels.