chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Procedures|Page 1681 > < Procedures|Page 1679
Page 13
background image

12. Install radiator upper hose (1).
13. Install upper intake manifoldSee: Intake Manifold - Installation.

14. Connect negative cable to battery (1).
15. Fill the cooling system.
16. With the DRBIII(R) scan tool use ASD Fuel System Test to pressurize system to check for leaks.

CAUTION: When using the ASD Fuel System Test, the Auto Shutdown (ASD) relay will remain energized for 7 minutes or until the ignition

switch is turned to the OFF position, or Stop All Test is selected.

17. Start engine and check for leaks.

Upper

UPPER INTAKE MANIFOLD

Non-Turbo

Procedures|Page 1681 > < Procedures|Page 1679