PT Cruiser L4-2.4L Turbo (2009)
4. RHD - Back out the tube nut (2) securing the pressure hose (3) to the gear (5). Pull the hose tube out of the gear and drain the fluid from the hose.
5. Remove the bolts (2) securing the pressure hose (1) routing clamps to the engine's structural collar.
6. Remove the bolt securing the pressure hose (2) routing clamp to the front of the engine near the starter.