chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Fuel Rail - Removal|Page 2897 > < Fuel Rail - Removal|Page 2895
Page 3
background image

12. Move the upper radiator house clamp back into place.

13. Install the 2 small hoses to the thermostat housing.
14. Fill the Coolant system, refer to the Cooling System.

15. Install the intake manifold.
16. Install the 2 bolts to the rear of the intake manifold tighten to 28 Nm (250 in. lbs.).
17. Install the 5 bolts to the front of the intake manifold and tighten to 28 Nm (250 in. lbs.).

Fuel Rail - Removal|Page 2897 > < Fuel Rail - Removal|Page 2895