chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Turbocharger System Lines - Removal|Page 3059 > < Turbocharger System Lines - Removal|Page 3057
Page 2
background image

COOLANT RETURN LINE

1. Position the coolant return line on the turbocharger.
2. Install NEW washers (2) onto the banjo fitting of the coolant return line. Hand start the banjo bolt.
3. Install the hose onto the thermostat housing.
4. Tighten the banjo bolt to 40 Nm (29.5 ft. lbs.).
5. Secure the coolant return line bracket to the turbocharger housing tighten to 12 Nm (9 ft. lbs.).
6. Fill the cooling system See: Engine, Cooling and Exhaust/Cooling System/Service and Repair/Cooling System. 

OIL SUPPLY LINE

1. If the engine block brass fitting (3) or turbocharger brass fitting was removed, apply thread sealer to threads and install. Tighten the brass fittings

(3) to 41 Nm (30 ft. lbs.).

2. Position the oil supply line (1) to the mounting location.

3. Hand start the flared fitting (2) at turbocharger.
4. Raise the vehicle on hoist.

5. Hand start the flared fitting (2) on the line to the engine block brass fitting (3).

Turbocharger System Lines - Removal|Page 3059 > < Turbocharger System Lines - Removal|Page 3057