PT Cruiser L4-2.4L Turbo (2009)
Shift Cable: Service and Repair
Shift Cable - Installation
INSTALLATION
1. Install cable assembly (2) through floor pan opening and secure to floor pan with grommet plate (1) and one screw. Make sure the three grommet
plate studs protrude through cable assembly and floor pan and tighten screw to 7 Nm (60 in. lbs.).
2. Route transaxle end of cable assembly into engine compartment and over transaxle assembly.
3. Install catalytic converter heat shield (1).