PT Cruiser L4-2.4L Turbo (2009)
8. Install manual valve lever (2) to manual shaft.
9. Install gearshift cable (1) to manual valve lever.
10. Install the battery tray (1).
11. Install the battery (1) and hold down clamp.
8. Install manual valve lever (2) to manual shaft.
9. Install gearshift cable (1) to manual valve lever.
10. Install the battery tray (1).
11. Install the battery (1) and hold down clamp.