PT Cruiser L4-2.4L Turbo (2009)
5. Install check balls (1 and 2) into position as shown. If necessary, secure them with petrolatum or transmission assembly gel for assembly ease.
6. Install separator plate (1) to valve body (2).
7. Install oil screen (1) to separator plate.