chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Timing Cover|Removal|Page 1846 > < Timing Cover|Removal|Page 1844
Page 2
background image

3. Lower engine into mounting position and install right engine mount through bolt. Tighten bolt to 118 Nm (87 ft. lbs.). 

4. Install power steering pump and bracket.

5. Install upper radiator support closure panel.

6. Install torque strut bracket to strut tower.

7. Connect ground strap to bracket.

8. Install upper torque strut.

9. Connect A/C lines and charge A/C system. Refer to See: Heating and Air Conditioning/Service and Repair

10. Raise vehicle.

11. Connect exhaust system to manifold.

12. Connect A/C pressure switch connector.

13. Install crankshaft damper. Refer to See: Cylinder Block Assembly/Harmonic Balancer - Crankshaft Pulley/Service and Repair

14. Install accessory drive belts. Refer to See: Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair

15. Install lower torque strut. Refer to See: Drive Belts, Mounts, Brackets and Accessories/Engine Mount/Service and Repair

16. Perform torque strut adjustment procedure. Refer to See: Drive Belts, Mounts, Brackets and Accessories/Engine Mount/Adjustments

17. Install right splash shield.

18. Install right front wheel.

19. Connect negative cable to battery.

REAR COVER 

1. Install rear timing belt cover and fasteners. Torque fasteners to values in the image shown.

2. Install timing belt idler pulley. Torque timing belt idler pulley fasteners to 61 Nm (45 ft.lbs).

Timing Cover|Removal|Page 1846 > < Timing Cover|Removal|Page 1844