Sebring V6-2.5L SOHC 24 Valve (1996)
Removal Service Point
2. Snap the boss and clamp with nippers or a flat-tipped screwdriver, etc to remove the heater control assembly.
NOTE: The boss and clamp are needed for assembly line at the factory, but not needed for service work.
Installation Service Point
INSTALLATION
For installation reverse steps in image and note the following:
Step 5
1. Always snap the boss and clamp before installing a new heater control assembly to the instrument panel.
NOTE: The boss and clamp are needed for assembly line at the factory, but not needed for service work.
Installation Service Point
2. Set the temperature control knob on the heater control assembly to MAX. HOT.
3. Set the air mix damper lever at the upper part of the heater unit to the MAX. HOT position, and install the cable to the lever pin.
4. Push the outer cable in the direction of the arrow so that there is no looseness, and then secure it with the clip.