Sebring Convertible V6-2.5L SOHC 24 Valve (1996)
6. Remove hoses from evaporative canister.
Fig 14 Evaporative Canister Attachment Nuts
7. Remove 3 nuts retaining evaporative canister to pump bracket.
8. Let evaporative canister set on lower fascia.
Fig 15 LDP Bracket Mounting Holes
Fig 16 Front Upper Mounting Bolt