Sebring Convertible V6-2.5L SOHC 24 Valve (1996)
Shift Indicator: Description and Operation
CIRCUIT OPERATION
Power for the PRNDL illumination diode is supplied on circuit E2. This circuit is controlled by the Body Control Module (BCM) based on input
from the headlamp dimmer switch on circuit E19.
Ground for the diode is supplied on circuit Z1. This ground terminates at the left side cowl.