Sebring Convertible V6-2.7L (2009)
Power Trunk / Liftgate Lock Actuator: Service and Repair
Decklid Release Solenoid - Installation
INSTALLATION
1. Install the latch and motor assembly.
2. Install the latch and motor mounting fasteners.
3. Install latch cover and push pins.
4. Close the deck lid.
5. Connect the battery negative cable.