Sebring Convertible V6-2.7L (2009)
8. Lower the top to the header. Do not latch at the header.
9. Remove the springs (4) from the 2/3 bow (2 and 3).
10. Remove the 2/3 mounting fasteners (1) and remove from the convertible top.
11. Place the top in the vertical position.
12. Disconnect and isolate the battery negative cable.
13. Disconnect the heated backlite electrical connectors.
14. Remove the middle side rail weather-strips on both sides.
15. Remove the rear panel with the top cover from the vehicle. See: Service and Repair/Removal and Replacement/Folding Top - Removal.
16. Remove the bolts to the front header casting assembly (12) and remove from header casting.
17. Remove the hydraulic cylinder from the hinge. See: Convertible Top Hydraulic Cylinder/Service and Repair/CST And RHT Common
Components/Folding Top Hydraulic Cylinder - Removal.
18. Make marks with a scribe or grease pencil to align the rail upon installation.