chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Convertible Top Primary Hinge - Removal|Page 7600 > < Convertible Top Primary Hinge - Removal|Page 7598
Page 2
background image

5. Install the rear panel with the top cover to the vehicle. See: Service and Repair/Removal and Replacement/Folding Top - Removal.
6. Install the middle side rail weather-strips on both sides.
7. Connect the heated backlite electrical connectors.
8. Connect and isolate the battery negative cable.
9. Place the top in the vertical position.

10. Install the 2/3 bow  (2 and 3) to the convertible top and install the mounting fasteners (1).
11. Install the springs (4) to the 2/3 bow.
12. Lower the top to the header. Do not latch at the header.

CONVERTIBLE TOP-FULL CLOSED

13. Install the mattress pad. 
14. Install the top cover back to the rear panel. The top cover and rear panel will be installed to the vehicle at the same time. See: Convertible Top

Deck Lid Components/Convertible Top Deck Lid/Service and Repair/Convertible Soft Top Unique Components/Folding Top Cover - Removal 

15. Install the two lower push-pins to the middle rail trim panel and carefully pull the trim engaging the retainers.
16. Install the header and front side rail trim fasteners and carefully pull down on the trim engaging the retainers.
17. Close the convertible top.
18. Install the rear and side trunk trim panels. See: Doors, Hood and Trunk/Trunk / Liftgate/Trunk / Liftgate Interior Trim Panel/Service and

Repair/Trunk Trim Panel - Removal.

19. Install the appropriate quarter trim panel. See: Interior Moulding / Trim/Trim Panel/Service and Repair/Luggage Compartment Trim/Quarter Trim

Panel - Installation.

Retractable Hard Top

INSTALLATION

Convertible Top Primary Hinge - Removal|Page 7600 > < Convertible Top Primary Hinge - Removal|Page 7598