Sebring Convertible V6-2.7L (2009)
Convertible Top Latch Actuator: Service and Repair
Folding Top Latch Motor - Installation
INSTALLATION
1. Ensure the motor spacer (4) is in the proper position on the power folding top presenter plate assembly (3).
2. Position the header latch motor and shaft (4) onto the presenter plate (5). The shaft must go through the drive rod assembly and the motor must be
positioned over the spacer.
3. Install the two motor retaining screws (2).
4. Connect the motor electrical connector (1).
5. Flip the presenter plate assembly over and install the motor shaft retaining clip.