Sebring Convertible V6-2.7L (2009)
7. Connect heater hose to supply tube at right front frame rail area.
8. Install AC/Generator belt tensioner/bracket assembly.
9. Install crankshaft vibration damper. See: Cylinder Block Assembly/Harmonic Balancer - Crankshaft Pulley/Service and Repair/Vibration Damper
- Installation
10. Install accessory drive belts (2) See: Drive Belts, Mounts, Brackets and Accessories/Drive Belt/Service and Repair/Removal and
Replacement/Serpentine Accessory Drive Belt - Installation.
11. Install belt splash shield and right front wheel.
12. Install coolant pressure container.
13. Fill cooling system.
14. Connect negative battery cable.