Sebring Convertible V6-2.7L (2009)
1. Install ECM (3) on mounting bracket. Torque fastener to 10.7 Nm (95 lbs. in.).
2. Connect both ECM electrical connectors (1).
3. Install air filter housing assembly (2)See: Fuel Delivery and Air Induction/Air Cleaner Housing/Service and Repair/Air Cleaner Body - Installation
.
4. Connect vacuum hose (1).
5. Connect negative battery cable.
6. Install air inlet tube (3).
7. Reprogram ECM. See: Testing and Inspection/Programming and Relearning.
Powertrain Control Module - Removal
2.7 3.5L (NGC)