chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Power and Ground Distribution|Locations|Page 5255 > < Power and Ground Distribution|Locations|Page 5253
Page 3
background image

CAUTION:

-

When installing the Totally Integrated Power Module cover, it is important to ensure the cover is properly positioned and fully
latched. Failure to do so may allow water to get into the Totally Integrated Power Module, and possibly result in an electrical
system failure.

-

When replacing a blown fuse, it is important to use only a fuse having the correct amperage rating. The use of a fuse with a
rating other than indicated may result in a dangerous electrical system overload. If a properly rated fuse continues to blow, it
indicates a problem in the circuit that must be corrected.

Power and Ground Distribution|Locations|Page 5255 > < Power and Ground Distribution|Locations|Page 5253