Sebring Convertible V6-2.7L (2009)
4. Remove the bolts (1) at the line pressure sensor (2).
5. Remove the line pressure sensor from the valve body.
6. Remove the bolt (1) at the pressure control solenoid (2).
4. Remove the bolts (1) at the line pressure sensor (2).
5. Remove the line pressure sensor from the valve body.
6. Remove the bolt (1) at the pressure control solenoid (2).