Sebring Convertible V6-2.7L VIN R (2003)
tensions. Replace any springs that do not meet specifications.
INSTALLATION - OFF VEHICLE
1. If removed, install valve(s).
2. If valves or seats have been reground, check valve tip height (A) (Fig. 40). If valve tip height for intake valve is greater than 47.59 mm (1.8737
in.) or 49.14 mm (1.9347 in.) for exhaust valve, grind valve tip until within specifications. Make sure measurement is taken from cylinder head
surface to the top of valve stem.
3. Install valve seal/spring seat assembly over valve guides on all valve stems (Fig. 41). Ensure that the garter spring is intact around the top of the
rubber seal. Install valve springs, valve retainers.
4. Compress valve springs with a valve spring compressor install locks and release tool. If valves and/or seats are reground, measure the installed
height of springs (B) (Fig. 40), make sure measurements are taken from top of spring seat to the bottom surface of spring retainer. If height is
greater than 38.75 mm (1.5256 in.), install a 0.762 mm (0.030 in.) spacer in head counterbore under the valve spring seat to bring spring height
back within specification.