Sebring LX Convertible L4-2.4L VIN X (2002)
7. Install plastic cover on shock assembly.
8. Install carpeting back on shock tower.
9. Install fasteners securing splash shield to shock mount.
10. Install wheel and tire assembly on vehicle. Install all wheel mounting nuts in proper sequence until all nuts are torqued to half specification. Repeat
tightening sequence to full specified torque of 135 Nm (100 ft. lbs.).
11. Lower vehicle to the ground.