chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Component Tests and General Diagnostics|Page 1777 > < Component Tests and General Diagnostics|Page 1775
Page 112
background image

STEP 3. Check the wiring harness between sunroof motor assembly connector D-08 (terminal 1) and fusible link (5).

NOTE:  Also check intermediate connectors C-28 and C-209 for loose, corroded or damaged terminals, or terminals pushed back in the connectors. If
intermediate connector C-28 or C-209 is damaged, repair or replace the damaged components) as described in Harness Connector Inspection.

Q:  Is the wiring harness between sunroof motor assembly connector D-08 (terminal 1) and fusible link (5) in good condition?

YES :  No action is necessary and testing is complete. 

NO :  The wiring harness may be damaged or the connector(s) may have loose, corroded or damaged terminals, or terminals pushed back in the
connector. Repair the wiring harness as necessary. The sunroof function should work now normally.

STEP 4. Check the battery power supply circuit to the sunroof motor assembly. Test at sunroof motor assembly connector D-08 by
backprobing.

1. Measure the voltage available at the harness side of sunroof motor assembly connector D-08 without disconnecting sunroof motor assembly.

Component Tests and General Diagnostics|Page 1777 > < Component Tests and General Diagnostics|Page 1775