Sebring LX Coupe V6-3.0L VIN H (2002)
1. Install stopper B in the shown direction.
2. Install stopper A in the shown direction while checking that the notches on stopper A are engaged with the projections on the trailing arm
bushing.
INSPECTION
-
Check the bushings for wear and deterioration.
-
Check the trailing arm for bends or damage.