chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Voltage Regulator > < Electrical Specifications|Page 4485
Page 2
background image

12. Remove the generator (Fig. 6).

INSTALLATION

1. Install generator (Fig. 6).
2. Install the 2 upper bolts but do not tighten.
3. Install the engine dip stick tube.
4. Connect the A/C pressure switch and A/C clutch electrical connectors.
5. Connect the B+ terminal and field connectors (Fig. 5).
6. Raise vehicle and support.
7. Install the lower bolt and tighten.
8. Install the accessory drive belt, refer to the cooling section.
9. Install the accessory drive splash shield.

10. Lower the vehicle.
11. Tighten the 2 upper mounting bolts.
12. Connect the negative battery cable.

Voltage Regulator > < Electrical Specifications|Page 4485