chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Connecting Rod Bearing Fitting|Page 2494 > < Connecting Rod Bearing Fitting
Page 2
background image

1.   For measuring connecting rod bearing clearance procedure and use of Plastigage Refer to ENGINE - STANDARD PROCEDURE. For bearing

clearance refer to Engine Specifications.

NOTE: The rod bolts should not be reused.

2.   Before installing the NEW rod bolts the threads and under the bolt head should be oiled with clean engine oil.
3.   Install each bolt finger tight then alternately torque each bolt to assemble the cap properly.
4.   Tighten the connecting rod bolts using the 2 step torque-turn method. Tighten according to the following values:

CAUTION: Do not use a torque wrench for the second step.

Tighten the bolts to 20 Nm (15 ft. lbs.).

Tighten the connecting rod bolts an additional 90°.

5.   Using a feeler gauge, check connecting rod side clearance. Refer to clearance specifications Refer to ENGINE - SPECIFICATIONS. 

Connecting Rod Bearing Fitting|Page 2494 > < Connecting Rod Bearing Fitting