chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Defroster Grille|Page 9733 > < Defroster Grille|Page 9731
Page 4
background image

NOTE:  Illustration shown with instrument panel removed for clarity.

1. Connect the right floor duct (1) to the right side of the HVAC housing (2). Make sure the duct is fully engaged to the housing.

2. On LHD models, install the glove box bin.

LEFT FRONT FLOOR DUCT

NOTE:  Illustration shown with instrument panel removed for clarity.

3. Connect the left floor duct (1) to the left side of the HVAC housing (2). Make sure the duct is fully engaged to the housing.

4. Install the screw (4) that secures the left floor duct to the HVAC housing. Tighten the screw to 2 Nm (17 in. lbs.).

5. On LHD models, connect the shift interlock cable (3) to the left floor duct.

6. On RHD models, install the glove box bin.

REAR FLOOR DISTRIBUTION DUCTS

Defroster Grille|Page 9733 > < Defroster Grille|Page 9731