Sebring Sedan L4-2.4L (2007)
NOTE: Passenger side shown. Driver side similar.
1. Connect each outer instrument panel duct (2) to the center instrument panel duct (3). Make sure the ducts are fully engaged to each other.
2. Position each outer instrument panel duct to the instrument panel top cover (5).
3. Install the screw (4) that secures each outer instrument panel duct to the instrument panel top cover. Tighten the screws to 2.2 Nm (20 in. lbs.).
4. Install the left and right instrument panel air outlets (1).
5. Install the instrument panel.
CENTER DUCT
6. Position the center instrument panel duct (2) to the instrument panel top cover (2) and engage the duct to the center of the cover. Make sure the
center duct is fully engaged to the cover.
7. Install the screws (3) that secure the center instrument panel duct to the instrument panel top cover. Tighten the screws to 2.2 Nm (20 in. lbs.).