chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Removal and Replacement|Page 10097 > < Removal and Replacement|Page 10095
Page 10
background image

9. Connect the A/C liquid and suction line assembly (2) to the A/C evaporator (3).

10. Install the bolt (1) that secures the A/C liquid and suction line assembly to the A/C evaporator. Tighten the bolt to 12 Nm (105 in. lbs.).

11. Position the heat shield (3) onto the studs (2) located on the dash panel in the engine compartment.

12. Install the three nuts (1) that secure the heat shield to the dash panel. Tighten the nuts to 1 Nm (10 in. lbs.).

13. Reconnect the negative battery cable.

14. If the heater core is being replaced, flush the cooling system.

15. Refill the engine cooling system.

16. Evacuate the refrigerant system.

17. Charge the refrigerant system.

18. Initiate the Actuator Calibration function using a scan tool.

Removal and Replacement|Page 10097 > < Removal and Replacement|Page 10095