Sebring Sedan V6-3.5L (2009)
Intake Manifold: Service and Repair
Intake Manifold - Installation
Intake Manifold Upper
UPPER INTAKE MANIFOLD
1. Clean and inspect gasket sealing surfaces.
2. Position new gasket.
3. Install the throttle body on the upper intake (if required)See: Powertrain Management/Fuel Delivery and Air Induction/Throttle Body/Service and
Repair/Throttle Body - Installation.
4. Install upper intake manifold (2) and hand start all attaching bolts (1).
5. Tighten bolts gradually starting in the center working outward until a torque of 12 Nm (105 in. lbs.) is obtained.
6. Install the rear intake manifold brackets to the head.
7. Install the 2 intake manifold to bracket nut retainers.
8. Install the EGR tube . See: Powertrain Management/Emission Control Systems/Exhaust Gas Recirculation/EGR Valve/Service and
Repair/Exhaust Gas Recirculation (EGR) Valve - Installation