chrysler Workshop Repair Guides

Chrysler Workshop Service and Repair Manuals

Exhaust Gas Recirculation > < Leak Detection Pump, Evaporative System|Locations|Page 3608
Page 2
background image

3. Install hoses to LDP.
4. Plug electrical connector into LDP.
5. Push connector locking tab into place.
6. Using DRB scan tool, verify proper operation of LDP.

Exhaust Gas Recirculation > < Leak Detection Pump, Evaporative System|Locations|Page 3608