1500 4x2 Pickup V8-5.2L CNG VIN T (1996)
Canister Purge Solenoid: Testing and Inspection
-
In the RUN or START position, the ignition switch connects circuit A1 from the Power Distribution Center (PDC) and circuit A21. Circuit A21
feeds circuit F18 through fuse 9 in the fuse block.
-
Circuit F18 splices to supply battery voltage to the EGR solenoid and connects to cavity A2 of the PCM.